TCS staff created and coordinated the design of a biomass plant (15 MW) in collaboration with AET supplier of the boiler. The design includes civil works, mechanical and electrical works.
TCS staff participated to the design and implementation of an energy power plant (about 2 MW) with heat recovery from the gases emitted from a sludge incinerator (2010).